It is designed to maintain the required ventilation mode in an isolated area during the construction of explosion resistant or isolation seals from gypsum, concrete or Tekblend to seal the hole after its completion, as well as to remove residual fire gases, carry out fire reconnaissance and evaluate fire extinguishing results.